THE RESIDENCE OF SHERMAN PLAZA A new, 26-story, high-end condominium building in the heart of Evanston’s downtown, and is the keystone to the redevelopment of that area. Huen Electric was chosen by Focus Development, and W.E. O’Neil Construction Company to provide design-build construction services for the project. This will be our second design-build project with Focus Development. We recently completed the Church Street condominium project just down the block from Sherman Plaza. The project consists of a new 26-story concrete structure
with 234 condominium units and 12 luxury units on the 23rd, 24th and 25th
floors. Many of the units will have private balconies or terraces. The
facility will include many amenities including a hospital room on the
3rd floor along with a roof garden complete with a bocce ball court and
sun deck. MARIANJOY REHABILITATION HOSPITAL - 175,000 square foot replacement hospital located on a 64.5 acre wooded campus in Wheaton, IL. When complete, there will be 120 private ADA accessible rooms, other features of the hospital include a pediatric suite with adjoining therapy space, new chapel, meditation room, wellness center, and overnight accommodations for guests. LOYOLA UNIVERSITY MEDICAL CENTER SELF PARKING STRUCTURE is a new 1,323 vehicle, six-story, free-standing parking garage. Located on Loyola’s medical campus, the structure replaces two existing single level, open-air parking lots. The project was designed by Walker Parking Consultants in conjunction with Pepper Construction Co. Design standards require all exposed conduit to be steel heavy-wall, utilizing all cast boxes. The pre-cast structure will require extensive coordination for box-outs, sleeves and cores. The electrical system will be fed from the University’s 13.2kV system; we will utilize a new 500kVA 13.2kV transformer to convert the power for the garage service. Along with the power and light, the structure will include a complete fire alarm system, rescue assistance system, personnel safety system and a close circuit TV (security) system. The parking facility is scheduled for completion in June of 2005.
|
|||
|
Home
| People | Projects
| What's New | About
Us |
||||