Amazon Distribution Center
Robbinsville, NJ
For this 1.5 million SF fast track development, Huen installed a Kiva Robotic System that eliminated the need for conveyors. The project included a 35 kV high voltage line, four 1,600 amp services, 80,000 feet of underground PVC, 4,000 bay lights and outlets, a smoke purge exhaust system, 800 fire alarm horn strobes, four major switch boards and 350 rooftop units for the HVAC system. The exterior included 350 site poles for a 2,500 car parking lot with two traffic lights